U.S. Airmen from the 211th Engineering Installation Squadron prepare to run fiber optic cables Nov. 14, 2017, at the 193rd Special Operations Wing, Middletown, Pennsylvania. The 211th EIS Airmen ran fiber optic cables to establish network connectivity to the base’s new Resiliency Center. (U.S. Air